Carpentry Shop Side of Workshop copper pipe originally Yubari Municipal Asahi Elementary
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 1 - Aug 6
Live Spec
Carpentry Shop Side of Workshop copper pipe originally Yubari Municipal Asahi ElementaryThe south elevation of the main workshop building at Elrington Colliery, captured in 2017, with the carpenter's shop lean to visible at the left edge and the gantry crane structure rising above the roofline. The central workshop housed the machine shop, electrical workshop, and a 15 tonne overhead electric crane. Coal production here ran from 1930 until December 1962, when BHP closed the mine citing persistent operating losses. Part of the Elrington
Store: www.parrocchiaolginate.it · Domain: www.parrocchiaolginate.it

























